Conference Dates

May 1-5, 2011

Abstract

A novel integrated pyrolysis pilot plant has been built in Tampere, Finland by Metso, in co-operation with UPM, Fortum and VTT. A 7 tons of bio-oil per day (2 MWfuel input) fast pyrolysis unit has been integrated with Metso’s 4 MWth CFB pilot boiler. Test runs of bio-oil production have been carried out during 2009-2010. More than 80 tons of bio-oil has been produced and utilization tests have been started in district heating burner applications.

Share

COinS